Day 13 - 30th September 2009 ((:
Thursday, October 1, 2009

Day 13

Bryan handed me a excel file of the registered participants data logging into the main database. It’s like attendance list. He wants me to sort out the customer category.
Which I also how to filter function in the excel.
It is to determine the different category of the ABB customer day event participants.

Convert Adobe Indesign file and collecting printings for Ying Hua.
Mr Ong Ah Keong asks me to go warehouse to help him do packaging the switch gang.
Remove the plastic switch from the gang. I think I did about 200 switch gang in 1 hour 30 minutes.
It is Germany Switch gang, hence it cost quite expensive.
It is also my first time going in the warehouse.
There are about 1700 of switch gang to complete.
`my safety boots
The banner on the door of the warehouse` level 2 warehouse
pic1
pic2
pic3
pic4
The 13A Switched Socket Outlet 1 Gang
There are 1700 switch sockets more to go.switch plastic covers
repack the plastic covers of 2 gang into this ABB plastic bag.1 Completed switch gang
This is what we do in the warehouse.
1 switched gang.
water heater switch gang
The back of the water heater switched gang