fonger went attachment.

Profile.

MEIHAR™ ❤
A BIG TWOZERO
30th March
jasmine_meihar@hotmail.com
Ngee Ann Polytechnic
`Electrical Engineering
(Solar Technology)

Local Attachment
ABB Industry Pte Ltd
2 Ayer Rajah Crescent
14th September 2009 to
5th February 2010.



talk.

affiliates.

Meihar((:

archives.

September 2009
October 2009
November 2009
December 2009
January 2010
February 2010

credits.

Day 55 - 27th November 2009 ((:
Saturday, November 28, 2009

Day 55

HARI RAYA HAJI Public Holiday! :DDDDD

Day 54 - 26th November 2009 ((:
Friday, November 27, 2009

Day 54

Bobby drove us there as he going down there to settle some issues. For me and Sok Yee we have appointment with Mr Koh from Sunlight Electric at Ubi there.

Came back office 2am. Later heading down to Huat Heng at Pandan Loop at 4pm.

Last minute, she have some issues happened on the site. It's on the ABB product, MCB having a yellow phase not working. Very serious issues. Hence, we cancelled the meeting.

Sunlight Electric
I was conducting survey with Mr KohWent down to Feng Sheng, ABB Distributor to get some MCB for customer.

Day 53 - 25th November 2009 ((:
Thursday, November 26, 2009

Day 53

Today is the most busiest day, have to meet 3 customers in the same building at Admiralty Northlink. Bryan drove there to meet the first customer at 11am, Puretech met up with Mr Alex Chan, director and Mr Eng, the purchaser conducting the Panel Builder Survey.

Had lunch together at RP.

Headed back the same location to meet Mr Elson Ang from Elsteel Techno(S) Pte Ltd at 2 pm and 3pm with Mr MK Khoh from Khoh & Khoh Brothers Electrical.

Almost every appointment about an 1 hour.

Day 52 - 24th November 2009 ((:
Wednesday, November 25, 2009

Day 52

Took cab down to Admiralty Street at Northlink Building.
Met up with 2 clients. 10am with Andrew Heng H.H and 11am with Michael Goh M.E power Integration.

Took bus 962 to Woodlands interchange for lunch. At 1pm went to OCBC to make my VISA card replacement. Came back office to compile the survey forms and at 3pm had AP Marketing Weekly meeting until 5.30pm. OT until 8.30pm.

Day 51 - 23rd November 2009 ((:
Tuesday, November 24, 2009

Day 51
This is a good picture showing what is panel builder.

Today went down to No. 4 Kallang Way 4, Electromech Electrical Enterprise. Met Mr Ricky Chan Lit Yee conduct survey at 10am with bryan. Until 11.20am back in office.

Sok Yee ask me for checking the panel builder day event at The Chevrons at 48 Boon Lay Way. Until 2pm back in the office. Update the panel builder panel survey.

Went to check the event programme.
The lobby
The poolside
The Chevrons
The pool.

























Day 50 - 20th November 2009 ((:
Saturday, November 21, 2009

Day 50

Came to the office to prepare the things for later meeting the client Mr Soh. Bryan drove me down to Toh Guan East Blk 48. Blackstone Power & Controls have shifted out to 1 Bukit Batok Crescent #07-39. Called and check the location for the new address. Around 10.20am met up Mr Soh and inside the meeting room conducting the survey. He is in charge 100% of the project in Philippines therefore, he uses and recommend more on ABB products like ACB and MCCB. He shares one to two experience of the past incident with us.

Around 11am we finished conducting the survey. Compile and update the 3 survey forms in the excel sheet. Came back office after lunch, realised that someone opened my panel builder file contact list.


Help Ying Hua to collect printing for the motor invites for the 4th December 2009. Winnie asks if Monday I can come office at 7.30am to help her in the invites for the external and internal drives event. She will help me for time-off day.

Day 49 - 19th November 2009 ((:
Friday, November 20, 2009

Day 49

Meeting with Michelle and Matthew, they want to find out the results after the 2 visits to the panel builders. 9.30 am to 10.30am. Compile the customer visit and transportation claims. Resourcing the Christmas pre-post event for AP 60mins as well. 6pm

Day 48 - 18th November 2009 ((:
Thursday, November 19, 2009

Day 48

Prepare the the goodies bag and appreciation token for the panel builder. One ABB folder with brochures and Y2010 calendar and one mini diary and a pen.

2pm went to Syntech Switchgear & Engineering Pte Ltd appointment with Mr Benjamin Hong but he not around.
Therefore, his mother LC Tan do the survey. His father is Steven Ang. prompting the questions in the interview.

Very nervous in the room. Sok Yee went with me.

4pm with Alvin Lim, Purchaser Inter power engineering Pte Ltd at Ang Mo Kio Industrial Park 2A. He share his experience and elaborate some of the things that our sales engineer is competent and etc. feedback about the support line and the services provided.

Day 47 - 17th November 2009 ((:
Wednesday, November 18, 2009

Day 47



Today Michelle is back. Discussed with her the panel builder plan was delay by a week. Due to LVP, Mr NS Koh said it is bias for sales person to in charge of the surveying the panel builder. This week have to start the make appointment with the panel builder. Dialled almost 30 contacts. Some accept the interview. Enercon system international LLCis not able to make appointment therefore, send the survey to the Zalinah, the administrator officer to do the survey. I’m not able to conduct the survey with Bryan Tan therefore, the best person is Zalinah Othman to take the survey.


Pack 10 door gifts for the visit for the panel builders. Tomorrow, I have 2 customer to meet. Benjamin Hong from Syntech enterprise at Lingjack industrial building at 2pm. Kelvin, Purchaser from Interpower engineering Pte ltd at 4pm.



Wrap up for the day.

Day 46 - 16th November 2009 ((:
Tuesday, November 17, 2009

Day 46
Singapore Orchid Country Club at YishunThe lobbyOrchid Bowling
He is Mr Ong PS, my supervisor.
Event going on there.
The poolside

Meeting from 9-10.20am. Panel Builder Day in end of January. Bobby, Matthew, Sok Yee and Ying Hua and myself. Wrap-up the conclusion of target audience 120 pax. 80 customer. 10 pax Mecomb and 30 pax ABB staffs. Event programme is pending.

11-1pm went down to Singapore Orchid Country Club (SOCC) at Orchid Club Road at Yishun. We went down to check the Orchid Bowl the charge per lane and game, shoes rental. 18 per hour. Per game 3.40, Shoes 1.20 and socks 1.50. the outdoor and the indoor dining. The golf club and the swimming pool. Check the site for the panel builder day event. Mr Ong PS, Bobby Ong and Sok Yee.

Had lunch at yishun with them.Mr Ong fetched me to Ngee Ann for report session and LO review at 1.30pm. went back school.

Day 45 - 13th November 2009 ((:
Saturday, November 14, 2009

I went Bryan to CPG consultants to meet Mr Chan.

He want to find out on the motor & drives technical stuffs. What is the rated nominal 690V usages on what kind of application. The RCBO and MCB for every output. The project like HDB does it use the RCBO and etc. How the quality of the motor and the graph that run inside the black box. Talked with matthew about the survey Panel Builder that Mr Ong PS don’t understand and might having the consultant to go will be myself and michelle to do the survey. Next week will start to make appointment with the client.
Afternoon there are 2 training for me to attend, but I only can attend one, either Motor&Drives Theory or DocWin training.




I had lunch with Mr Lim SL in Fusionopolis with sokyee, bryan, Ying Hua. Went to them to buy the pastries at marketplace at Fusionopolis. The docwin, Sok Yee introduce ABB. Mr Ong PS talked about the circuit breakers and specification. Lionel introduce the DOCWIN software. How to use the docwin on the cable sizing for using the appropriate circuit breakers and put in the numbers to suit the situation. 1 putout but there could have many outputs. 4 Rankine and Hill engineer attended the training. 2 Mechanical engineer another 2 electrical engineer dept.


Trimmed 9 stickers for Chris Tan for the invoice labels.

Day 44 - 12th November 2009 ((:
Friday, November 13, 2009

Day 44

Today, count the number of pages per chapters of the pricebook. Divide the chapter 5 into 3 category namely soft starters, LV & MV Drives and motors.

With Nazreen help, she teach me how to use the pivot of the excel with the percentage and etc. Weixin call me and let me do the IC for the team building session.

But due to restriction again, Ying Hua want to do it as she is the admin for the marketing team. 8 names, contact and any diet or injuries.

Day 43 - 11th November 2009 ((:
Thursday, November 12, 2009

Day 43

had lunch with phil chan, Winnie, sok yee, Mr Ong, Nazreen. I helped Nazreen with the compiled of the survey form of the robotics training on the 27/28th Oct external training. Update the database with external robotics training of the name cards. About 10 name cards by Nazreen.

Day 42 - 10th November 2009 ((:
Wednesday, November 11, 2009

Day 42

Today, I type in all the data into the excel. Name, position, address, postal, email, contact numbers. Matthew add in the frontline Person-In-Charge1&2.

Nazreen taught me how to talk to clients on the phone to make appointment.
AP marketing weekly Meeting in Dahlian until 7pm. Talking about project and employee and employee facing problems. Solutions and a common database visit clients templates. Using excel pivot. 18th dec team building with drives services. Etc etc

Day 41 - 9th November 2009 ((:
Tuesday, November 10, 2009

Day 41

Matthew have check the survey and approved. He also handed me the contact list who to call.


I managed to finish up with the database but still need to check the category and industry properly. I went up to HR and told Yvonne to declared the personal laptop with ABB Pricing, she advice me to use the software and not to access the ABB network, as the IS said it will detect the IP Address, the AP marketing BU will hold responsible anything if there happens.

Day 40 - 6th November 2009 ((:
Saturday, November 7, 2009

Day 40



Main Database entry (1/2) and busy with the survey questionnaires and supplimentry questions for the panel builders. I come out with all the questions and let Matthew to see.

Printed several times to check any grammatical errors and mistake.

Today, bought my laptop and busy editing the survey and thinking the supplimentry questions. Discussed with Nazreen and Michelle. As Michelle is one week on leave therefore I handle the whole survey myself.

Day 39 - 5th November 2009 ((:
Friday, November 6, 2009

Day 39

Today is Soft Starters Services Training. Hands-on how to dissemble the soft starters and identify the components inside the soft starters. How to repair the soft starters if the components failed or change the system circuit board. End around 4pm.


The cables for troubleshooting in the computer. The amazingly is we can save the data logging. By using the cross-over cable to PC and Soft starters, Maximum only store 20 memory of the log in and more than that will automatic clear it away. It is for the end-user engineer to use them. There are another way is the proper way of connecting the soft starters and the PC. As in The data can be saved and stored. Unlike the cross-over TCP/IP address. This is able to enable through the internet. Assemble the PSS and PST after lunch. Identify the cable and screw it back.


Meeting with Michelle and Matthew at Dahlian room for the LVP survey for the Panel Builders between Mecomb and ABB. To find out the panel builder who is the preferred partner, cost, stock, value and pricing. We suggest that we meet face-to-face.


By Monday will complete the LVP survey and the supplimentaries questions. Would like to invite the Panel Builders to attend the Panel Builder Day in January 2010. On the 9th November 2009, Matthew will provide the contact list. Let him go through the survey form/questions. By visit, we have to give door gifts to the customers. 10th November to 13th November 2009 call to make appointment with panel builders. I and Michelle will go down to interview in week 47/48 from 16th November 2009 onwards till end of November. End of the survey have to give summary and conclusion.
Dismantle PSS
The crocodile clips is to measure the thyristors of the busbars The MEGA ohm meter. An enormous ohmmeter ever seen. hahah.
The PSS busbars and the connectorsPrinted Coated board of PSSPCBThe cable connectionsPST(B) Printed Coated Board








Day 38 - 4th November 2009 ((:
Thursday, November 5, 2009

Day 38


Registered and attended the internal 2 days soft starters training. Speaker from Sweden, Manager. He taught different ways of soft starters graph and explain what is soft starters in various ways. Introduce the software as simulation mode to use the soft starters change the settings and control the condition. Identify the different types of soft starters for different condition.

Day 37 - 3rd November 2009 ((:
Wednesday, November 4, 2009

Day 37

Printing the labels of the shelf and content pages.

Completed labelling the 4 shelf and the additional shelf until volume 29 of the shelf 2.

Around 4pm Anthony ask me to help Shankar with the autocad drawing the project circuit in her laptop. Using a similar file to do additionally circuit and add in the components like capacitors, treated water pump. It is a single-line diagrams input. Editing the labels of the components in the circuit. Example: (500W) - water pump and etc. Tonight the client have to receive the 2 drawings. Aftermath, continue with the labels in the library.

Day 36 - 2nd November 2009 ((:
Tuesday, November 3, 2009

Day 36
Sriraman on site. He has assigned me to do the library of the Fusionopolis project completed and on-going project.
Create table of contents of the each shelf of the library.
Packing and list the volume file description and create the table on word document.
Anthony taught me how trace software for power generation. He showed it tome and taught me. This is the library where stores all the files/project and etc.

The rolling shelves. Cos the shelves can push and have 4 rollers at the bottom. Therefore, i named it as The rolling shelves.

The A0 map layout. Project Completed yet to be kept but not yet done.

writing out the file description to do labelling in the library. I'm like the libraries sia.Ah-ha i label them out. trimming the labels4 shelves of labels. Can u imagine i open all the file and writing all out. first shelves completedwooohooo! completed in 2+ hrs pasting the labels.
Took a day to finish. more to go. But also have to depend I heading back to power generation for secondattachment.