Day 35 - 30th October 2009 ((:
Saturday, October 31, 2009

Day 35


-Photocopying 18 volume and printing.
-Each volume, have to photocopy 3 sets.
-Filing the volume and check every pages if there any missing pages.
-Put each section in each divider for every file.
-Stickers for the label of the file.
-Plastic protection for the map layout and label them individually.

-Map Layout plotting using the plotter at level 5.
-Filing and labelling the file.

OT until 9pm. Project name Additionally Claims for the extended project at Fusionopolis as targeted completed dates. The monetary values of the project additional claims for the Fusionopolis project.
my desk.
The number of copies i have printed
How to navigate the printer
The printing is in progress
Filing the documentation
A3 + colour printing using different printer.
This is the plotter to do map layout printing. Shedding the some of the paperwork. Labelling of the file and section
Job Completed.



Day 34 - 29th October 2009 ((:
Friday, October 30, 2009

Day 34

Continuing with my Database entry.

Day 33 - 28th October 2009 ((:
Thursday, October 29, 2009

Day 33

In the morning 9am attended the James Large from Malaysia. It is a internal training PLC, Programmable Logic Control training. In the morning 9am - 12.15noon theory on PLC devices and specification.

At 1.30pm, hands-on on the coDeSys software for the PLC. Partner with Valerie we integrate different ways in the simulate mode to do the PLC programming. AND/OR gates, writing the program, Program call function, build the program and load into the PLC device with USB cable connected and etc.

Went to JM Pang Consultant to pay a visit to the client with Sok Yee at Macperson road. Took cab there and back to company on company expenses. Content on ABB Stuffs and training we have, especially which the client signed up for the ABB day but did not attend.



PLC Training~

The Bus Module Spring-type

Central Processing Unit
PLC PLC module is Screw-type
Side View of Fieldplug
The Fieldplug
CS32 Bus Module Spring-type
The modular part of PLC
PLC

Day 32 - 27th October 2009 ((:
Wednesday, October 28, 2009

Day 32


Not feeling well. Took MC today. )):

Day 31 - 26th October 2009 ((:
Tuesday, October 27, 2009

Day 31

Main Database entry almost half completed. On-going Task


Sriran came to find Mr Ong on Thursday for manpower needed on Friday till Thursday. I went to look for him, to see what to do for tomorrow at power generation.

Day 30 - 23rd October 2009 ((:
Saturday, October 24, 2009

Day 30



Attended the AP Marketing Debrief ABB Customer Day 11.45am to 1.30pm.

had a free lunch at the staffs corner.
Especially for those who helped out in the ABB Customer Day.



Pack the cupboard and create a excel file of inventory tracking for the in/out stocks.

Inventory Tracking Items like Person Name, Item Description, Cost, Quantity, Signature and etc.

Day 29 - 22nd October 2009 ((:
Friday, October 23, 2009

Day 29



Today attended the Safety Training at Work.


Safety Trainer Ariel Licup.

Day 28 - 21st October 2009 ((:
Thursday, October 22, 2009

Day 28
In the morning, attended internal ABB Quality Training, Trainer by Ariel Licup.
It is a enriching training and I learnt how to improve Quality Operation, the Quality Basics and implement Problem Solving Techniques at work. 9.00am to 12.30 noon.
This is the Quality Training.

Executing the first task

Who, when, where, what, how to do itThis is the fish-bone diagram.The statics of the poor performanceQ4 - Does it work it out? Results is good. ((:




Day 27 - 20th October 2009 ((:
Wednesday, October 21, 2009

Day 27

AP marketing hold weekly meeting, individual update tasks.
A few hours in the meeting room. Discussion as well.


My colleagues is resigning, so tomorrow will have a farewell lunch with Kelvin Khan with AP Marketing Team.

Day 26 - 19th October 2009 ((:
Tuesday, October 20, 2009

Day 26

Fusionopolis project.

Files to be done.

Operation & Maintenance Manuel for CD Shelter.I was assisting Santhosh at Power Generation BU for 1 day. the volume content page.
One whole day doing documentation for the Fusionopolis project (wrap-up stage), filing the papers into different section. the RCCB spec.
After filing, I have to highlight the important points in the volume. There are 5 volumes, each volume have 3 sets.

Amendment of the content pages and add additional section for the volume.
Check for missing pages.

That's all for the day.


Day 25 - 16th October 2009 ((:
Saturday, October 17, 2009

Day 25

Continued with the progressing the database with 990 entry.


Pricebook additional pages in section 9. Ying Hua assigned me to add in 9 pages.
Completed until 6.30pm. Today OT for 1 hour.

Day 24 - 15th October 2009 ((:
Friday, October 16, 2009

Day 23

Ying Hua was on MC.

Mr Ong approved Nazreen to appointed me to help her in the Database entry for the AP marketing team.
completed 1/6 of the database. It is still an on-going task. It is confidential file.

Do 2 hours of OT.

Day 23 - 14th October 2009 ((:
Thursday, October 15, 2009


Day 22



Filter the ABB feedback and the RSVP attended for the event.
Due to confidental of the customer particulars not able to print screen what i've done.





Drop an invoice of the foods on the ABB day to finance dept.

Day 22 - 13rd October 2009 ((:
Wednesday, October 14, 2009

Day 21


Today Bryan assigned me to do circuit design with Microsoft Office Visual 2003.

the first circuit drawing.


Completed one before 12 and another piece after lunch.




Today is tueday therefore we have AP marketing weekly meeting.
Individual have a list of events and assignments to report and update.
For myself, more on the PriceBook with 55% as LVP prices is still pending. Need to have Lincoln to mark the final prices. Need to be appropriate attire for customer visit.



Bryan suggested if able he would like to give me follow to Variable Speed Drives at PowerGrid testing. Marketing is about promoting the ABB products and etc

Day 21 - 12nd October 2009 ((:
Tuesday, October 13, 2009

Day 21

Today not much things to do.


Therefore, started my bi-monthly report.

Day 20 - 9th October 2009 ((:
Saturday, October 10, 2009

Day 20

we went down to pick up the boxes at the warehouse. To unpack the goodies bag after the ABB Day.

Wrap the umbrella in the warehouse. too bulky and heavy to bring it up to the office.my first time seeing how they sealed up the boxes in the warehouse too.

TADA! It's done!

Ying Hua and Bryan is on leave. Winnie on training.
LVP department is having their pin ball event, bonding team.
The office is quite empty and quiet.
Mr Ong said I should attend the seminars and attend the exhibition.
In the morning, very busy unloading and moving the cartons of goodies bag and brochures and plastic holders and pens and etc with michelle.
About 4 rounds of up and down from warehouse and office.
Unpack the goodies bags and pack it and count the quantity from 9am to 12 noon.
Only the door gifts, umbrellas are left in the warehouse for Ying Hua to settle and tabulate out the notepad, door gifts, pen, brochures and folders and also the plastic holders.
ABB products is handing with any electrical components.
Helped Nazreen with the heavy loads of work and main database entry.
It is company confidential. Well, Key in all the tags for those who are invited but did not attend for the event. Tabulate the things.

Total no. of customer of 262.
Registered: 356
Attended: 240
Walk-in: 22

Sok Yee CC in the email from MR Lim SY.
A Thank you card to me for the work done for the preparation and making a success day.
The Key Performance Index (KPI) more than 5 persons in the queue.




Day 19 - 8th October 2009 ((:
Thursday, October 8, 2009

Day 19

ABB Customer Day
This shall let the pictures do the talking.


my tag for the ABB Day

In the morning, busy moving out the goodies bag to the register counter.400 goodies bags


Giving out the tag accordingly to their register number.
As the picture above.
The blue lanyard means attending the full seminar.
The yellow lanyard represent customer attending half day event.
There are 3 different counter for different category. The registration counter A to C For the walk-in customer, they have to fill in the form which I'm the person in charge and my colleagues to hand them a goodies bag and their tag. This is the an example.The friendly look from our ABB staffs.The overall of the registration was pretty well-received.
we managed to achieve the Key Performance Index(KPI) not more than 5 person in the queue.


I and Nazreen on duty.
We also make sure all the customer in the correct queue receiving their tags.
This is the information counter for those who forgot their number tags.
This the opening ceremony by James Foo, our country manager of ABB Industry Pte Ltd.The people who attending and walking into the auditorium.The crowds.During the seminar.
There are 4 distinguished speakers from various industries. The Q&A sessionLastly, the prize giving ceremony.
Which all of us waiting for!


First prize: Macbook
For the consolation prize are the 3 ipod nanos to be won as well.


In between the seminar, we have a short break for lunch, teabreak from the catering Purple Saga. AH-HA ! i caught Mr Teo in the picture!



The second half of the day is the exhibition and the products display and the product demonstration.


The amusement from the customers. The attentiveness! everyone is soo busy.the variable speed drives.
The instrumentation.a friendly handshake.browsing through the catalog.the man in black suit, he is from a media side.our NP lecturer with ABB staffs.enquires on the product.the instrumentation side.After the event 4 plus. We have to dismantle the products off the board.
A long hardwork in this product demonstration.
pack up and remove the product display.myself.

Lastly the 7 new products launched in ABB Day.
I contributed in the alignment in the design of the 7 posters.
But lastly with yinghua's hardwork, final touch of the posters.The first workpiece.the second workpiece.the third workpiece.the fourth workpiece.the fifth workpiece.
the sixth workpiece.last workpiece.`3 stand alone panels.
the another 4 stand-alone panels.the best of the day is the product demo which we spent one whole day yesterday mounting and troubleshooting. YEAH!Suki, myself, Zin Mar, Vanessa and Jasmine.Zin Mar, she also graduated from NP 1 year back.
I know them during the registration counter. Jasmine, myself,Vanessa and Fiona `ABB
My colleague, Sok Yee
My twin sister, Vanessa.
Mdm Tan, myself, Mdm Tham and Mr Teo.
Enjoyed alot today. ((: