Day 18 - 7th October 2009 ((:
Thursday, October 8, 2009
Day 18
The Matrix, biopolis

`The board at biopolis
pic1
they are putting the board down to paste the poster up.
the demostration board.
wiring the products on the board.
busy with the poster pasting.
pic2
`troubleshooting.After finished the wiring the products, we have to do troubleshooting.There are faulty problems like loose wiring, MCCB faulty, no wire contact in the product.
Mr Andrew Kwek taught me and Kok Lun, how instrumentation work and run.
How the current cut off at different levels, Long interruption, short interruption, Instantaneous and Ground. He also showed us the graph when the high current input and the timing at 0.1 to 0.4 seconds cut off to another higher level of interruption.
Work until 9pm
The theme of the ABB Customer Day 2009
The banner of the ABB day.
The long hardwork done for the numberous hours of demostration board for tmr event.
the 4 new products booth.