fonger went attachment.

Profile.

MEIHAR™ ❤
A BIG TWOZERO
30th March
jasmine_meihar@hotmail.com
Ngee Ann Polytechnic
`Electrical Engineering
(Solar Technology)

Local Attachment
ABB Industry Pte Ltd
2 Ayer Rajah Crescent
14th September 2009 to
5th February 2010.



talk.

affiliates.

Meihar((:

archives.

September 2009
October 2009
November 2009
December 2009
January 2010
February 2010

credits.

Day 18 - 7th October 2009 ((:
Thursday, October 8, 2009

Day 18 The Matrix, biopolis
`The board at biopolis
pic1
they are putting the board down to paste the poster up.
the demostration board.wiring the products on the board.
busy with the poster pasting.
pic2
The contractors doing the alignment of the poster on the board.
pic3

This morning, have to print out all the papers to paste it up at The Matrix, Biopolis.
Tag printing and posters.
the brochures for the goodies bag and the event.
Busy with the goodies bag. Helping out.
After lunch, we have exactly 400 goodies bag to pack.
We have to move all the boxes to the registration counter to pack. Michelle guided us what to put in the bag. Each of us handle one item so as to speed up the time. Took about 2 hours to completed.
The tools.cutting the cable.
I went to help Kok Lun, Alvin and Steve with the board demonstrations.
ounting the products, screwing, trimming and suitable cables for individual products like live wire and thin copper cable for only contact purpose. the front of the demo before mounting.
the final touch for the wiring and tidy the board with cable ties
Example of an product wiring on the demo board.
`troubleshooting.

After finished the wiring the products, we have to do troubleshooting.There are faulty problems like loose wiring, MCCB faulty, no wire contact in the product.

Mr Andrew Kwek taught me and Kok Lun, how instrumentation work and run.
How the current cut off at different levels, Long interruption, short interruption, Instantaneous and Ground. He also showed us the graph when the high current input and the timing at 0.1 to 0.4 seconds cut off to another higher level of interruption.

Work until 9pm
The theme of the ABB Customer Day 2009

The banner of the ABB day.

The long hardwork done for the numberous hours of demostration board for tmr event.the 4 new products booth.

the another 3 new products booth.
This is also the art work that the marketing done for the past few weeks.
the solar panel.

The functionality of the instrument. The instrument.The graph of the instrumentation.