fonger went attachment.

Profile.

MEIHAR™ ❤
A BIG TWOZERO
30th March
jasmine_meihar@hotmail.com
Ngee Ann Polytechnic
`Electrical Engineering
(Solar Technology)

Local Attachment
ABB Industry Pte Ltd
2 Ayer Rajah Crescent
14th September 2009 to
5th February 2010.



talk.

affiliates.

Meihar((:

archives.

September 2009
October 2009
November 2009
December 2009
January 2010
February 2010

credits.

Day 33 - 28th October 2009 ((:
Thursday, October 29, 2009

Day 33

In the morning 9am attended the James Large from Malaysia. It is a internal training PLC, Programmable Logic Control training. In the morning 9am - 12.15noon theory on PLC devices and specification.

At 1.30pm, hands-on on the coDeSys software for the PLC. Partner with Valerie we integrate different ways in the simulate mode to do the PLC programming. AND/OR gates, writing the program, Program call function, build the program and load into the PLC device with USB cable connected and etc.

Went to JM Pang Consultant to pay a visit to the client with Sok Yee at Macperson road. Took cab there and back to company on company expenses. Content on ABB Stuffs and training we have, especially which the client signed up for the ABB day but did not attend.



PLC Training~

The Bus Module Spring-type

Central Processing Unit
PLC PLC module is Screw-type
Side View of Fieldplug
The Fieldplug
CS32 Bus Module Spring-type
The modular part of PLC
PLC