fonger went attachment.

Profile.

MEIHAR™ ❤
A BIG TWOZERO
30th March
jasmine_meihar@hotmail.com
Ngee Ann Polytechnic
`Electrical Engineering
(Solar Technology)

Local Attachment
ABB Industry Pte Ltd
2 Ayer Rajah Crescent
14th September 2009 to
5th February 2010.



talk.

affiliates.

Meihar((:

archives.

September 2009
October 2009
November 2009
December 2009
January 2010
February 2010

credits.

day 5 - 18th September 2009 ((:
Saturday, September 19, 2009

Day 5

It’s already the fifth day of work in ABB. Today, came office to check my NP results. I think today is a productive day for me.
Bryan handed me Adobe Indesign CS4 to install.
It took almost 2 hours to finish downloading.
Project Lead & Consultant, Sok Yee gave work to do. There are 7 files in the folder, New Product Booth.
I was assign to use and design posters with the use of the Adobe Indesign.
Completed 4 posters, Sok Yee praised I can complete 4 posters today in a few hours.
At first, I thought I will not able to do because it like designing brochures as in their product templates and aligning and fitting the words in.
Cropping the pictures within the grid and font size and format closely.
Therefore, I’m left with 3 posters to complete next week.