Day 39 - 5th November 2009 ((:
Friday, November 6, 2009

Day 39

Today is Soft Starters Services Training. Hands-on how to dissemble the soft starters and identify the components inside the soft starters. How to repair the soft starters if the components failed or change the system circuit board. End around 4pm.


The cables for troubleshooting in the computer. The amazingly is we can save the data logging. By using the cross-over cable to PC and Soft starters, Maximum only store 20 memory of the log in and more than that will automatic clear it away. It is for the end-user engineer to use them. There are another way is the proper way of connecting the soft starters and the PC. As in The data can be saved and stored. Unlike the cross-over TCP/IP address. This is able to enable through the internet. Assemble the PSS and PST after lunch. Identify the cable and screw it back.


Meeting with Michelle and Matthew at Dahlian room for the LVP survey for the Panel Builders between Mecomb and ABB. To find out the panel builder who is the preferred partner, cost, stock, value and pricing. We suggest that we meet face-to-face.


By Monday will complete the LVP survey and the supplimentaries questions. Would like to invite the Panel Builders to attend the Panel Builder Day in January 2010. On the 9th November 2009, Matthew will provide the contact list. Let him go through the survey form/questions. By visit, we have to give door gifts to the customers. 10th November to 13th November 2009 call to make appointment with panel builders. I and Michelle will go down to interview in week 47/48 from 16th November 2009 onwards till end of November. End of the survey have to give summary and conclusion.
Dismantle PSS
The crocodile clips is to measure the thyristors of the busbars The MEGA ohm meter. An enormous ohmmeter ever seen. hahah.
The PSS busbars and the connectorsPrinted Coated board of PSSPCBThe cable connectionsPST(B) Printed Coated Board