fonger went attachment.

Profile.

MEIHAR™ ❤
A BIG TWOZERO
30th March
jasmine_meihar@hotmail.com
Ngee Ann Polytechnic
`Electrical Engineering
(Solar Technology)

Local Attachment
ABB Industry Pte Ltd
2 Ayer Rajah Crescent
14th September 2009 to
5th February 2010.



talk.

affiliates.

Meihar((:

archives.

September 2009
October 2009
November 2009
December 2009
January 2010
February 2010

credits.

Day 54 - 26th November 2009 ((:
Friday, November 27, 2009

Day 54

Bobby drove us there as he going down there to settle some issues. For me and Sok Yee we have appointment with Mr Koh from Sunlight Electric at Ubi there.

Came back office 2am. Later heading down to Huat Heng at Pandan Loop at 4pm.

Last minute, she have some issues happened on the site. It's on the ABB product, MCB having a yellow phase not working. Very serious issues. Hence, we cancelled the meeting.

Sunlight Electric
I was conducting survey with Mr KohWent down to Feng Sheng, ABB Distributor to get some MCB for customer.