fonger went attachment.

Profile.

MEIHAR™ ❤
A BIG TWOZERO
30th March
jasmine_meihar@hotmail.com
Ngee Ann Polytechnic
`Electrical Engineering
(Solar Technology)

Local Attachment
ABB Industry Pte Ltd
2 Ayer Rajah Crescent
14th September 2009 to
5th February 2010.



talk.

affiliates.

Meihar((:

archives.

September 2009
October 2009
November 2009
December 2009
January 2010
February 2010

credits.

Day 60 - 4th December 2009 ((:
Friday, December 4, 2009

Day 60


This morning 7.30am got into the office get ready for the event preparation.


I was ushering as well as doing the registration counter at the customer centre. Example like “Hello Good morning to the customer!” “Which company you are from? Customer’s Name?

`Me andThe customer.

Drop a Business card.Each was given a name badge and goodies bag.


Around10.30am, will have a light Tea-break from some catering. Hence, as well as I'm the photography taking pictures around with the customers. During the training, took some pictures as well for the to upload into the Intranet ABB.


Had lunch at the staff corner with the customer. After the lunch, some of the customer would like to visit the Drives Service Workshop, hence I following together with them.



Leong was introducing the procedures and process to the customers and myself.

Aftermath, event over have to went up to the customer centre and staff corner to pack up. Things like goodies bag, coffee and sweets and sweet bowl and sockets and etc.


Pack and clean up all the items and gave the brochures and goodies bag to lynette and Philip Ng in the LV drives dept until 4pm plus. Keep all the things before knock off.
12 Major OHS RuleDrydock world to be insert into the ACS800 DrivesThe high voltage Drives
Inspection point.Dismantle the parts Service 1 & 2
Washing pointAssemble and Testing to be done.