fonger went attachment.

Profile.

MEIHAR™ ❤
A BIG TWOZERO
30th March
jasmine_meihar@hotmail.com
Ngee Ann Polytechnic
`Electrical Engineering
(Solar Technology)

Local Attachment
ABB Industry Pte Ltd
2 Ayer Rajah Crescent
14th September 2009 to
5th February 2010.



talk.

affiliates.

Meihar((:

archives.

September 2009
October 2009
November 2009
December 2009
January 2010
February 2010

credits.

Day 68 - 16th December 2009 ((:
Thursday, December 17, 2009

Day 68

reporting work at 10am today. At 5pm, having meeting with the LVP of the panel builder survey done during november. Discussion on what is done on the survey and the results. How can survey is can be conducted besides just a neutral party conducting.


Hence, The list of interviewee is still not total completed. Task now is to complete handful of interviewee to end the PB survey. Matthew want me to write out the action plan can be done each individual interviewee and the problem that they are facing.