Local Attachment
ABB Industry Pte Ltd
2 Ayer Rajah Crescent
14th September 2009 to
5th February 2010.
Today went down to Powergrid at Telok Blangah there with Bryan.
We were in the Power Quality Lab doing some testing on the VSD and the motor. How much can the VSD torque&frequency.
We were there from 9am.
At the same time, I helped bryan to do a video shooting at the lab of the explaining of the 50Hz testing on Variable Speed Drive, motor and graphs statistics.
Had lunch with Nazreen, Who was the previous night WINNER for the D&D first prize.