fonger went attachment.

Profile.

MEIHAR™ ❤
A BIG TWOZERO
30th March
jasmine_meihar@hotmail.com
Ngee Ann Polytechnic
`Electrical Engineering
(Solar Technology)

Local Attachment
ABB Industry Pte Ltd
2 Ayer Rajah Crescent
14th September 2009 to
5th February 2010.



talk.

affiliates.

Meihar((:

archives.

September 2009
October 2009
November 2009
December 2009
January 2010
February 2010

credits.

Day 98 - 27th January 2010 ((:
Wednesday, January 27, 2010

Day 98

This morning, Steve have finished up the programming in Isabel's room and returning the CPU back to me. I have to complete the material codes excel file first of all. As well as the artwork of the name badges.
Valarie helped me in some of the type of the products - ordering code.

around 11am, I and Michelle have to go out to meet Sueanne Chong at Huat Heng Engineering Pte Ltd. Miss Chong is not around. Hence, his fellow colleagues, the design panel, 2 purchaser have to attend to us with the survey. How much they know about the ABB product and the problems they always faced.

After the survey, we waited 15 minutes no avail of Taxi at East Coast Highway. Hence, we have to take a few buses back to office. Claiming my transportation fees. The usual thing i have to do, every survey conducted.