fonger went attachment.

Profile.

MEIHAR™ ❤
A BIG TWOZERO
30th March
jasmine_meihar@hotmail.com
Ngee Ann Polytechnic
`Electrical Engineering
(Solar Technology)

Local Attachment
ABB Industry Pte Ltd
2 Ayer Rajah Crescent
14th September 2009 to
5th February 2010.



talk.

affiliates.

Meihar((:

archives.

September 2009
October 2009
November 2009
December 2009
January 2010
February 2010

credits.

Day 94 - 21st January 2010 ((:
Thursday, January 21, 2010

Day 94

Ying Hua is guiding and teaching me how to write ABB intranet articles.
For the feb, there is an top management meeting at fairmont hotel.
I and Ying Hua are doing some name badges for the attendee from regional top management.
The artwork was a big times. We spent a few days doing and alignment of the images and the corporate guidelines. Printing out to check some of the wordings and artwork done. Numberous amendments made as well.

Late morning, Mr Lim SY and John need to me to write the Non-Disclosure Agreement (NDA) from the PDF file. They lost the softcopy and need me to type the NDA and re-edit the file for the tender to sign.

As well as, this assignment was in a rush to completed. Around 4 plus. Mr Lim SY came back office and printed out the copy to him and send him a copy of the document that i've done.
In the noon, I have been trying to called Michael Lee - Guthrie Engineering Pte Ltd. It seem not able to get through him. He did not pick up his calls. I have to try again tmr.